Vaisala RS92-KL Manuale Utente Pagina 15

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 45
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 14
Chapter 3 ________________________________________________________________ Operation
VAISALA_______________________________________________________________________ 13
CHAPTER 3
OPERATION
This chapter contains information that is needed to operate this product.
General
It is essential that you carry out the pre-launch steps as instructed and
always in the same way. Follow the instructions in the following
sections and refer to Appendix A on page 39 for proper and safe balloon
preparation.
The workorder for a sounding is as follows:
1. Prepare the balloon and optional sounding accessories.
2. Unpack the radiosonde.
3. Perform sounding preparations.
4. Connect the battery.
5. Launch the radiosonde.
6. Monitor the sounding with the DigiCORA® Sounding System.
Vedere la pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 44 45

Commenti su questo manuale

Nessun commento